- VOLUME I-A MFSA Application
- Table of Contents
- CHAPTER 1
Purpose, Need and Benefits
- CHAPTER 2
Proposed
Action and Project Alternatives
- CHAPTER 3
Affected Environmental
- CHAPTER 4
Environmental Consequences
- CHAPTER 5
Consultation and Coordination
- CHAPTER 6
List of Preparers and Contributors
- CHAPTER 7
References
- CHAPTER 8
Acronyms and Glossary
- VOLUME I-B Engineering, Cost and System Planning Information
- Cover
Page
- APPENDIX A-1
ARM 17.20.811 All Facilities, Estimated Cost of Facility
- APPENDIX A-2
17.20.815 Linear Facilities Estimated Annual Costs
- APPENDIX A-3
MSFA Pricing Policy Affidavit Summary
- APPENDIX A-4
Planning
- APPENDIX A-5
Rocky Mountain
Area Transmission Study (RMATS)
- APPENDIX A-6
17.20.923 Electric Transmission Lines, Reliability of Service
- APPENDIX A-7
17.20.924
Electric Transmission Lines, Economy Considerations
- APPENDIX A-8
17.20.929 Linear Facilities, Interconnection Agreements
- APPENDIX A-9
17.20.1305 Electric Transmission Lines, Criteria for Evaluation of
Alternatives
- VOLUME I-C
-
APPENDICES B-G
APPENDIX B
Environmental Protection Measures
APPENDIX C
Specifically Recommended Mitigation Measures
APPENDIX D
MSTI Construction and Ground
Disturbance Assumptions
APPENDIX E
Subroute Graphics and Data
APPENDIX F
Route Selection Process
APPENDIX G
Public and Agency Scoping Summary Report
|
- VOLUME II Technical Reports
- Table of Contents
- REPORT 1
Biological Resources Technical Report
- REPORT 2
Water Resources and Wetland Technical Report
- REPORT 3
Geology and Soils Technical Report
- REPORT 5
Land Use Technical Report
- REPORT 6
Visual Resources Technical Report
- REPORT 7
Socioeconomics Technical Report
- REPORT 9
Impact Data Tables - CDs
- VOLUME IV-A Regional Study Report
-
Introduction - Table of Contents
- Executive Summary
- CHAPTER 1
Introduction
- SITING STUDY
- CHAPTER 2
Study Methods
- CHAPTER 3
Inventory and Sensitivity Analysis
- CHAPTER 4
Alternative Corridor Identification
- CHAPTER 5
Alternative and Preferred Route and Station Sites Identification
- CHAPTER 6
Authorizations and Permits
- PRELIMINARY ENGINEERING
-
CHAPTER 7
Transmission Line Design Criteria
- CHAPTER 8
Conductor Study
- CHAPTER 9
Structure Study
- CHAPTER 10
Cost Estimates
- CHAPTER 11
Future Study
- CHAPTER 12
Permitting and Right-of-Way Costs
- CHAPTER 13
Project Schedule
- APPENDIX A
Siting Study Supplemental Data
- VOLUME IV-B Regional Study Maps
-
EXHIBIT 1 Land Jurisdiction and Special Management Areas
-
EXHIBIT 2 Existing Land Use and Designated Utility Corridors
-
EXHIBIT 3 Visual Sensitivity
-
EXHIBIT 5 Sensitive Plants
-
EXHIBIT 6 Wildlife Resources
-
EXHIBIT 7 Engineering Constraints and Geohazard Sensitivity
-
EXHIBIT 8 Composite Sensitivity and Constraints
-
EXHIBIT 9 Potential Townsend and Ringling Substation Sites
-
EXHIBIT 10 Alternative Corridors, Routes and Substation Sites
|