Montana Alberta Tie LTD (MATL)
February 2008
Federal Draft EIS and State of
Montana Supplemental Draft EIS
for the
Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line
(138 Mb Very Large pdf document)
LEGAL NOTICE
The Montana Department of Environmental Quality (DEQ) and US Department of
Energy (DOE) will conduct public hearings on the Draft Environmental Impact
Statement (DEIS) for the Proposed Montana Alberta Tie transmission line.
HELENA— Montana Alberta Tie Ltd. has proposed to build a 230 kV electric
transmission line from Lethbridge, Alberta, to Great Falls, Montana. DEQ and DOE
(the agencies) have recently released a joint document on the project. For DEQ,
the document serves as a supplement to Montana’s previously released Draft EIS.
The document also serves as DOE’s Draft EIS.
Pursuant to the requirements of Section 75-20-302 of the Montana Codes, DEQ is
providing notice to persons owning property that may be affected by the line and
local reroutes. Copies of the document summary and a CD containing the document
are being mailed to interested parties in the project area. Persons who
commented on the DEQ’s Draft EIS and landowners potentially affected by
suggested local reroutes will be mailed a complete copy of the document.
Additional information about the project, including project maps, will be posted
on the DEQ website at: http://www.deq.mt.gov/MFS/MATL.asp. Additional
information can be obtained by contacting either DEQ’s Tom Ring at (406)
444-6785 or DOE’s Ellen Russell at (202) 586-9624.
The agencies will conduct hearings on March 11-13, 2008 to take oral and written
comments on the Draft EIS. The hearings will be held at the following locations
from 6-9 P.M.:
March 11: Great Falls - Civic Center, Missouri Room, 2 Park Dr. S.
March 12: Cut Bank – Voting Center, 917 East Railroad St.
March 13: Conrad –Norley Hall, 400 N Virginia
Written comments are being accepted on the document during a 45-day comment
period which will end on March 31, 2008. Written comments may be submitted to
either:
Montana Department of Environmental Quality
Environmental Management Bureau
ATTN: Tom Ring
PO Box 200901
Helena, MT 59620-0901
Or e-mailed to: MATL@mt.gov
DEQ and DOE will make reasonable accommodations for persons with disabilities
who wish to participate in the hearings. A person in need of accommodation
should contact Tom Ring at DEQ at (406) 444-6785 to advise of the needed
accommodation no later than March 10, 2008.